墨西哥灣深水水平井鉆井平臺起火沉沒事故

[加入收藏][字號: ] [時間:2010-05-27  來源:博研論壇  關注度:0]
摘要:   You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, bur...


  You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, burned for two days, thensank in 5,000 ft of water in the Gulf of Mexico.  There are still 11 men missing, and they are not expected to be found.  
The rig belongs to Transocean, the world’s biggest offshore drilling contractor.  The rig was originally contracted through the year 2013 to BP and was working on BP’s Macondo exploration well when the fire broke out.  The rig costs about $500,000 per day to contract.  The full drilling spread, with helicopters and support vessels and other services, will cost closer to $1,000,000 per day to operate in the course ofdrilling for oil and gas. The rig cost about $350,000,000 to build in 2001 and would cost at least double that to replace today.


Nautilus, being transported on a Heavy-Lift vessel


  The rig represents the cutting edge of drilling technology.  It is a floating rig, capable of working in up to 10,000 ft water depth.  The rig isnot moored; It does not use anchors because it would be too costly and too heavy to suspend this mooring load from the floatingstructure.  Rather, a triply-redundant computer system uses satellite positioning to control powerful thrusters that keep the rig on station within a few feet of its intended location, at all times. This is called Dynamic Positioning.
The rig had apparently just finished cementing steel casing in place at depths exceeding 18,000 ft.  The next operation was to suspend the well so that the rig could move to its next drilling location, the idea being that a rig would return to this well later in order to complete the work necessary to bring the well into production.
It is thought that somehow formation fluids – oil /gas – got into the wellbore and were undetected until it was too late to take action.  With a floating drilling rig setup, because it moves with the waves, currents, and winds, all of the main pressure control equipment sits on the seabed – the uppermost unmoving point in the well. This pressure control equipment – the Blowout Preventers, or ‘BOP’s” as they’re called, are controlled with redundant systems from the rig.  In the event of a serious emergency, there are multiple Panic Buttons to hit, and even fail-safe Deadman systems that should be automatically engaged when something of this proportion breaks out.  None of them were aparently activated, suggesting that the blowout was especially swift to escalate at the surface.  The flames were visible up to about 35 miles away.  Not the glow – the flames.  They were 200 – 300 ft high.
 

上一頁12345下一頁


          您的分享是我們前進最大的動力,謝謝!
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2012 www.1314163.com Inc All Rights Reserved 全球石油化工網 版權所有
京ICP證120803號 京ICP備05086866號-8 京公網安備110105018350
主站蜘蛛池模板: 美女内射毛片在线看3D| 国产三级观看久久| 国产人妖视频一区二区| 午夜dj在线观看免费高清在线| 亚洲熟妇色自偷自拍另类| 久久综合日韩亚洲精品色| 久久国产精品无码网站| caoporn国产精品免费| 欧美第一页浮力影院| 精品国产三级a∨在线观看| 欧美日韩亚洲视频| 无遮挡色视频真人免费| 在线看无码的免费网站| 国产亚洲情侣久久精品| 免费视频www| 伊人久久大香线蕉综合影院首页| 亚洲国产香蕉视频欧美| 东北少妇不戴套对白第一次| 成人免费黄色网址| 欧美日韩国产高清视频| 女同久久精品国产99国产精品| 国产丰满麻豆videossexhd| 亚洲国产欧美日韩一区二区| 一区二区高清视频在线观看| 青青青青手机在线观看| 欧美日韩一区二区三区麻豆| 岳一夜被你要了六次| 国产剧情片视频资源在线播放| 免费大片黄在线观看日本| 久久亚洲精品人成综合网| 2019中文字幕在线| 男人操女人的网站| 无码专区aaaaaa免费视频| 国产精品久久久久影院| 亚洲色中文字幕在线播放| 丁香狠狠色婷婷久久综合 | 一本一道久久综合狠狠老| 顶级欧美熟妇高潮xxxxx| 案件小说h阿龟h全文阅读| 在线欧美视频免费观看国产| 免费的毛片网站|