摘要:簡介:挪威斯塔萬格國際研究院(IRIS)發明了一種新鉆井方法,它有針對性的解決了連續管鉆井過程中清潔井眼和鉆壓控制等問題。可行性研究表明,使用這種已成熟應用的方法,也可以解決有接頭鉆桿鉆井中遇到的一些問題。 A JIP proves ...

簡介:挪威斯塔萬格國際研究院(IRIS)發明了一種新鉆井方法,它有針對性的解決了連續管鉆井過程中清潔井眼和鉆壓控制等問題。可行性研究表明,使用這種已成熟應用的方法,也可以解決有接頭鉆桿鉆井中遇到的一些問題。

A JIP proves the effectiveness of a new drilling method at IRIS’s Ullrigg facility. 

The new drilling method is based on a patented drilling fluid flow arrangement. It incorporates a pipe-in-pipe concentric drill, where one conduit is used to pump fluid into the well and the other carries the return fluid from the well. A sliding piston, attached to the drillstring downhole, separates dual-gradient annular drilling fluid and aids in pressure/traction control. Lastly, an optional liner can be inserted while drilling and expanded downhole during the same run. This option enables mono diameter well designs, simultaneously drilling and lining the well.

DRILLING RIG ADAPTATION 

The Ullrigg Drilling and Well Centre is a well-equipped, full-scale drilling rig with pumps, mud cleaning system, storage tanks, well-control equipment, 5-in. drill pipe etc. The vertical U1 well was used in the verification program. It has 13 3/8-in. surface casing to 354-m (1,161-ft) MD, and a 12 ¼-in. openhole section to 1,258-m (4,127-ft) MD. A 300-m-long 13¾-in. casing was installed and an 80-m-long cement plug was placed in the casing’s lower part for the drilling tests. 

The basic drilling setup uses a top-string adapter, the dual drillstring, a sliding piston, dual float and flow crossover. The setup is the same for both plain and line drilling, with field-proven rotating BOP and under-reamer technology used as enablers of the system, Fig. 1.


The idea for a new drilling method was born at Rogaland Research, now the International Research Institute of Stavanger (IRIS) in Stavanger, Norway. The idea was motivated by the challenges of solving hole cleaning and weight-on-bit control for coiled tubing drilling applications. After a feasibility study, the method was refined and found applicable to solve several challenges for jointed pipe drilling as well. The patented Reelwell Drilling Method showed unique features for the following applications: 

• Managed pressure drilling: Pipe connections can be performed at constant downhole pressure without any shut-in pressure at surface using a downhole valve.
• Liner drilling: A liner can be installed in the same run, while a new section is being drilled. Also, there is an option to expand the liner in the same run.
• Deepwater drilling: Return fluid is transported back to surface through the drillstring, enabling advanced gradients of the annular well fluid.
• Extended-reach drilling: The method generates hydraulic thrust downhole and offers unique hole cleaning capability. 

In 2004, Reelwell was founded and acquired intellectual property rights to the technology. A joint industry project to verify the method was then conducted from 2005-2008, funded by StatoilHydro, Shell and the Research Council of Norway. Beginning in 2005, the Research Council of Norway and Statoil funded a feasibility study, which was conducted by Reelwell. In 2006, Shell joined the project and the critical components were built and tested in the laboratory. Last year, a full-scale prototype was tested at IRIS using the research rig, Ullrigg. 

The main goal for the project was to verify the: 

• Proof of concept and its practical application on conventional drilling rigs
• Capability for hole cleaning and downhole pressure/traction control
• Drill-in liner application and optional liner expansion.
This article presents the basics of the method and the results from the verification program. 

Fig. 1 . The verification program tested plain drilling and liner drilling using two different tool sets.

Plain drilling’s equipment arrangement is shown on the left side of the figure. The sliding piston is attached to the dual drill pipe some distance above the lower BHA. The dual float and flow crossover are positioned at the top of the lower BHA. 

Liner drilling’s arrangement is shown on the right side of the figure including: a liner coupling attached to the dual float in the lower BHA, a liner expander, attached to the sliding piston and a liner attached between the liner coupling and the liner expander. 

The surface system includes a mud pump, which pumps drilling fluid into the side entry port of the top-string adapter and down the annular drillstring channel. The returning fluid comes back through the inner channel of the dual drillstring and passes through a surface choke system before returning to the shaker and mud tanks, Fig. 2. On the top of the BOP is a Rotating Control Device (RCD), which allows well annulus pressurization while drilling. The upper well annulus, between the sliding piston and the RCD, is pressurized by a pump.


Fig. 2 . This flow schematic of the surface system includes a mud pump, a surface choke system shaker, mud tanks and rotating control device on the top of the BOP.

The drilling sample consisted of a 300-m-long, 10¾-in. casing assembly hanging in the wellhead. The lower casing joint had a welded steel plug on the bottom end. The casing contains an 80-m cemented section on the bottom, covered by 15 m of sand, which was used for the drilling trials. The sand was removed from the well for inspection after drilling and lining was completed. 

A ¼-in. hydraulic control line is installed in the annulus between the 133/8-in. casing and the 10¾-in. casing to measure well pressure while drilling and for kick trials. The upper end of the line is connected to a pressure gauge at surface near the wellhead. The lower end of the line is connected to the inside of the 10¾-in. casing through a hole drilled in the casing at about 200 m depth, i.e. 100 m above the bottom steel plug. 

The 10¾-in. casing joints in the drilling sample were point welded in the connections to avoid unscrewing during drilling trials and the casing was locked for possible rotation at the casing hanger by a special arrangement. The 10¾-in. drilling sample was removed from the well after testing. 

At Ullrigg, the drilling fluid flow arrangement was modified, Fig. 3. The fluid is pumped into the side entry port of the top-string adapter through a separate 2-in. hose from the pump manifold. The return flow from the well comes from the top of the top-string adapter, through the main mud hose. From the standpipe the fluid flows through a 2-in. hose via the choke and down to the normal return-flow conduit.


Fig. 3 . At Ullrigg, the drilling fluid flow arrangement was modified so that the return flow from the well comes from the top of the top-string adapter, through the main mud hose.

TOOLS AND EQUIPMENT 

The following tools were used for plain drilling. The top-string adapter is positioned at the top of the dual drill pipe. This adapter contains a swivel and has one flow port to allow pumping drilling fluid down into the well and another port for the return flow from the well. The top-string adapter is attached to a hose for the side-entry inflow and is attached to the conventional swivel in the travelling block for the return flow. 

The dual drill pipe is a conventional 5-in. drillstring that was modified with inner pipe inserts in a patented arrangement. This allows for quick and easy modification of a conventional drillstring into a dual drillstring at the wellsite. 

The sliding piston is attached to the dual drill pipe downhole. It is arranged to always run inside the casing, and isolates the well annulus outside the dual drillstring. The piston allows for bypass flow when required, but also allows pressurization of the well annulus between the piston and the BOP/RCD. This arrangement converts the well into a hydraulic cylinder, where the sliding piston is the cylinder piston and the dual drillstring is the cylinder rod. The sliding piston allows the use of different fluid properties below and above the piston. Thus, it is possible to have a high-density kill mud in the well above the sliding piston, while the fluid in the well below the sliding piston is a lower density active circulation fluid. 

The dual float is a patented automatic pressure-operated valve positioned at the lower end of the dual drill pipe. This float enables simultaneous closure and opening of both drillstring channels. In the failsafe default position, the valve closes both channels. The float enables downhole isolation of the well and thus pressure-less connections at surface during Managed Pressure Drilling (MPD). 

The data acquisition and sensor package contains pressure sensors and flowmeters. The in-flow meter is mounted at the standpipe manifold and the return flowmeter is mounted at the exit of the return choke. The system has built-in computer models for diagnosis and control. 

The RCD was rented from Weatherford, a Williams model 9000. The tool is a simple, passive RCD with a 500 psi maximum pressure rating.
The upper annulus control consists of a pump set up for a maximum flow of about 400 liters per minute (lpm). The pump is remotely controlled from the driller’s cabin. 

The return choke was a remote dual choke, rented from Ullrigg. The choke panel was positioned next to the driller cabin to ensure easy communication between the driller and the choke operator. 

LINER DRILLING TOOLS 

Several additional pieces of equipment are needed for liner drilling. The liner expander is a patented system. The liner coupling is also patented and allows for the coupling of the liner to the drillstring with built-in switches for flow and rotation control.
The under-reamer, a DTU 7200, was rented from Smith. The under-reamer was mounted directly to a 7 7/8-in. tri-cone drill bit from Smith. This tool opened the hole from 7 7/8-in. to 9 1/2-in. 

The spider acts as a secondary drill floor and enables the setting of slips on the drill pipe when running the drillstring through the 8 5/8-in. liner, while the liner hangs in slips at the drill floor. It was rented from Odfjell. 

Ullrigg was set up for rotation with a hexagonal kelly. The kelly was modified with an inner string to match the inner string in the dual drill pipe. The top-string adapter was mounted on the top of the kelly. 

RESULTS 

After the 10¾-in. casing sample was installed and the BOP was mounted, the drilling sample was pressure tested to 270 bar against the closed BOP shear ram. The RCD was installed and tested prior to drilling. 

Figure 4 presents the results from the initial pressure tests of the upper annular volume in the well, i.e. the volume enclosed by the following surfaces: in the radial direction between the outside of the dual drill pipe and the inside of the 10¾-in. casing, and in the axial direction between the closed annular BOP and the sliding piston.


Fig. 4 . During the annulus test, the hook load increases in steps according to the increase in the annular pressure, demonstrating the hydraulic force transfer capability of the sliding piston.

During the test sequence, the pressure in the well annulus was increased stepwise to 50 bar using the upper annulus control pump. The test was performed with continuous circulation through the drill bit. The hook load increased in steps according to the increase in the annular pressure demonstrating the hydraulic force transfer capability of the sliding piston to the hook load. It also demonstrates the sealing capability, since there was no need to supply fluid to hold the pressure. 

When the drillstring is first lowered into the hole, and then pulled out of the hole, the return flow from the well responds immediately when moving the drillstring, Fig. 5. When not moving the drillstring, the return flow and the inflow have equal value. When moving the drillstring into/out of the well, the return flow increases/decreases respectively, due to the added closed-end steel volume that is lowered into the well.


Fig. 5 . When moving the drillstring inside the well, the return flow responds immediately when the drillstring is moved.

The figure shows that differential flow can be measured precisely and that the sensitivity to detect kick and drilling fluid loss is high. The resolution in measuring the volume changes by the differential flow arrangement is judged to be less than 10 lpm, i.e. very precise and fast compared to conventional detection methods. 

Drilling trials. Figure 6 presents the records from drilling one drill pipe joint through the cement plug using the plain drilling system. The pipe joint was drilled down in 40 min. with ROP up to 20 m/hr. The return flowrate is generally slightly higher than the inflow rate during drilling. Spikes occur in the return flow measurement at startup, and occasionally in the following minutes due to pipe movements etc. Occasional leaks were observed on the RCD during the trials, especially when the tool joints passed through the rubber sealing element.


Fig. 6 . When drilling the cement with the plain drilling system the return flowrate is slightly higher than the inflow rate.

Cuttings transport. The cuttings are particles with a maximum size of a few millimeters. However, in some instances particles of 1-3 cm were produced and efficiently transported to the surface during drilling operations. 

The demonstration program verified efficient transport of solids up to 10% concentration by volume. No plugging of the return flow conduit occurred during the tests. This demonstrates very high cleaning efficiency, and indicates the potential of the method to solve hole cleaning problems experienced in the field. The surface choke once showed a tendency to accumulate cuttings; however, it was successfully cleaned by flushing. 

Downhole pressure control. The pressure control system in the upper annulus above the sliding piston operated efficiently and reliably. When drilling, downhole pressure is determined by the drilling fluid density and the dynamic friction component in the return flow. When the pump is stopped, the dynamic component is zero. 

To keep constant downhole pressure in the well while the mud pump is stopped, pressure regulation is done by choking the return flow. After the dual float is closed, pressure in the well is isolated downhole by the sliding piston and the dual float. Thus, during connections there is no surface pressure. 

When restarting circulation after the connection, the dual float is again opened, and the circulation flowrate is established and adjusted, so that all required choking is performed through the return conduit and little or no choking is performed at the surface. The system’s capability to keep the downhole pressure near constant during connections was successfully proven during the test program. 

Controlling influx and loss. Proper well control was demonstrated by precisely measuring the gain/loss from the well, controlling gain/loss rapidly by choke or flowrate control and by closing the dual float to isolate the well at depth. The flow sensor arrangement enabled fast and precise detection of kick and loss, and both control methods were successfully demonstrated. The ability to avoid loss of the annular well fluid above the sliding piston was demonstrated in the pressure tests. The establishment of detailed well control procedures and the certification of tools are ongoing. 

Pipe handling. Figure 7 presents the situation while handling dual drill pipe, showing a connection at the drill floor. In general, the pipe handling was performed without any large difficulty or problem. Prior to operations, the return pipes were individually adapted and inserted into the conventional 5-in. drill pipe. The handling of the dual drill pipe then followed procedures similar to conventional pipe handling. The dual drill pipe was handled efficiently in singles, and was also racked in stands into the derrick.


Fig. 7 . Prior to the drilling, the return pipes were individually adapted and inserted into conventional 5-in. drill pipe.

Liner drilling. Drilling with liner was difficult because of a failure in the under-reamer tool. The only available tool, suited for our application, was used elsewhere prior to the test. The failure implied that the under-reamer arms did not open the hole to the required size. Drilling engineers decided to stop when the liner was drilled about 20 m into the new section. The liner was then expanded to hang in the 10¾-in. casing and released from the drilling BHA. After liner release, the drillstring was pulled to the surface, leaving the 85 m long liner section downhole as planned. 

Tool performance. The top-string adapter worked without any problems throughout the test period. The sliding piston showed excellent performance. The results indicate that 30 bar of backpressure gives about an extra 10 tons on the hook. The hook load increase represents a hydraulic force provided by the sliding piston, which can be converted into a downhole thrust force. The large potential and capacity for hydraulic WOB was thus proven. 

The dual float was subjected to an extensive test program in the laboratory. The tool experienced a leakage during the first part of the tests, due to a failure in the opening procedure. However, the tool was repaired and performed according to specifications during the rest of the trials. The tool has proven to be efficient for downhole pressure control. 

The liner expander performed well in several tests and the combination of the liner expander and the sliding piston proved to be a very efficient liner expansion system. The liner coupling also showed good performance during the trials. After pulling out of hole, the liner coupling was in good condition, and the primary mechanism for liner release was proven. 

CONCLUSION 

The new drilling method was successfully proven during the verification program, demonstrating that the sliding piston provides weight-on-bit by hydraulic means and prevents loss of the annular well fluid. Hole cleaning was efficient and could transport large cuttings in the returns. Gain/loss volumes of less than 1:100 were rapidly detected. Downhole well isolation was good and only small pressure fluctuations occurred during pipe connections. Drilling with liner was shown to be feasible, including liner hanger expansion and release from the liner after drilling. 

All components of the drilling system have proven acceptable performance. The verification program was challenged by a hole diameter less than planned, due to an improperly working under-reamer. This issue will be solved in future applications. 

The verification program has confirmed the practical application of this new drilling method. It also has large potential for MPD, for challenging pressure zones and depleted reservoirs. The method also has special features for extended-reach drilling and for deepwater applications. The next step is to demonstrate the method for deeper drilling in an onshore well.

關鍵字: drilling drill 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 www.1314163.com Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
国产精品婷婷午夜在线观看 _国产精品亚洲自拍_天天综合日日夜夜精品 _蜜桃免费网站一区二区三区_都市激情国产精品_亚洲国产精品一区二区第四页av _heyzo一区
成人av电影在线播放| 色综合色综合色综合色综合色综合 | 久久aⅴ国产欧美74aaa| **网站欧美大片在线观看| 26uuu国产电影一区二区| 欧美日韩久久不卡| 欧洲一区在线电影| 91视视频在线观看入口直接观看www | 亚洲精品老司机| 中文字幕的久久| 国产精品日产欧美久久久久| 精品国产一区二区国模嫣然| 成人免费在线观看入口| 国产亚洲精品bt天堂精选| 久久男人中文字幕资源站| 欧美国产日韩一二三区| 国产精品久久午夜| 亚洲欧美激情一区二区| 亚洲日本免费电影| 天天亚洲美女在线视频| 老司机免费视频一区二区三区| 精品一区二区免费在线观看| 风间由美中文字幕在线看视频国产欧美| 欧美va亚洲va国产综合| 国产亚洲欧美激情| 最好看的中文字幕久久| 婷婷成人综合网| 国产综合久久久久久久久久久久 | 午夜免费欧美电影| 国产免费久久精品| 国产喷白浆一区二区三区| 久久久影视传媒| 国产精品女主播在线观看| 欧美激情综合在线| 欧美国产日韩在线观看| 一区二区不卡在线视频 午夜欧美不卡在 | 欧美中文字幕不卡| 欧美日韩一级大片网址| 欧美疯狂做受xxxx富婆| 久久这里只有精品视频网| 亚洲精品一区二区三区99| 中文字幕av一区二区三区高| 亚洲最大色网站| 久久成人av少妇免费| av在线不卡网| 色噜噜狠狠色综合中国| 91精品国产91久久久久久最新毛片| 亚洲精品一区二区精华| 亚洲一区二区成人在线观看| 老鸭窝一区二区久久精品| 岛国精品一区二区| 欧美精品久久天天躁| 777色狠狠一区二区三区| 精品成人免费观看| 亚洲综合网站在线观看| 日韩午夜中文字幕| 一区二区在线免费| 成人免费看的视频| 日韩区在线观看| 午夜激情一区二区三区| 99精品在线观看视频| 欧美激情综合五月色丁香 | 99久久777色| 久久综合色综合88| 看片网站欧美日韩| 91久久精品国产91性色tv| 国产精品嫩草影院com| 国产盗摄精品一区二区三区在线| 国产91丝袜在线播放| 欧美一区二区三区四区在线观看| 亚洲成av人影院在线观看网| 91视频在线观看免费| 日本一区免费视频| 国产成人精品亚洲午夜麻豆| 欧美大肚乱孕交hd孕妇| 日本欧美一区二区三区乱码| 欧美日精品一区视频| 亚洲乱码一区二区三区在线观看| 成人91在线观看| 日韩美女视频一区二区| jizzjizzjizz欧美| 中文一区在线播放| 国产成人免费9x9x人网站视频| 欧美国产综合色视频| 国产一区二区三区免费在线观看| 欧美成人一区二区三区片免费 | 欧美一区二区三区在线电影| 久久不见久久见免费视频1| 久久久精品免费观看| 国产99久久久国产精品免费看| 中文字幕的久久| 欧美日韩精品一区二区三区四区| 夜夜嗨av一区二区三区网页| 欧美人成免费网站| 久久成人av少妇免费| 国产精品不卡一区二区三区| 欧美日韩1234| 国产成人在线色| 亚洲成人综合在线| 精品99999| jlzzjlzz亚洲女人18| 久久超碰97人人做人人爱| 国产精品久久久久久久久免费丝袜| 精品视频免费看| 成人午夜私人影院| 亚洲高清不卡在线| 日本一区二区三区高清不卡| 精品视频在线免费看| 国产高清精品在线| 日韩电影一区二区三区| 亚洲欧洲av在线| 2023国产精华国产精品| 在线日韩国产精品| 国产成都精品91一区二区三| 亚洲va欧美va人人爽| 亚洲欧美另类图片小说| 精品对白一区国产伦| 欧美另类高清zo欧美| 91亚洲永久精品| 国产成人福利片| 亚洲第一成年网| 国产精品天天摸av网| 欧美一区二区三区在线观看视频| 91久久精品一区二区二区| 国产在线一区观看| 免费观看日韩电影| 午夜久久久久久| 亚洲午夜在线观看视频在线| 专区另类欧美日韩| 日本一区二区不卡视频| 久久久一区二区三区捆绑**| 日韩欧美一级片| 日韩欧美123| 久久国产精品99久久久久久老狼| 天天综合色天天| 日本va欧美va精品发布| 日产精品久久久久久久性色| 亚洲午夜精品在线| 一区二区三区四区在线| 亚洲夂夂婷婷色拍ww47| 亚洲韩国精品一区| 亚洲综合在线免费观看| 一区二区三区免费| 亚洲一区二区三区免费视频| 亚洲午夜一区二区| 美女国产一区二区| 午夜欧美在线一二页| 日韩高清一级片| 精品一区精品二区高清| 国产不卡在线视频| eeuss鲁片一区二区三区| 在线观看91精品国产入口| 欧美精品1区2区| 国产日韩欧美精品一区| 国产精品乱子久久久久| 亚洲成人av福利| 国产高清在线精品| 日韩欧美国产不卡| 亚洲三级在线免费观看| 日韩精品视频网站| 国产成人三级在线观看| 欧美色图在线观看| 久久综合成人精品亚洲另类欧美 | 高清国产一区二区| 色激情天天射综合网| 欧美一区二区三区播放老司机| 国产欧美日韩不卡| 午夜精品影院在线观看| 日本一区中文字幕| 色综合天天视频在线观看| 精品欧美一区二区三区精品久久| 亚洲综合图片区| 成人深夜在线观看| 日韩精品一区二区三区中文不卡| 亚洲最色的网站| 国产成人亚洲综合a∨猫咪| 欧美日韩国产经典色站一区二区三区| 国产性天天综合网| 激情六月婷婷久久| 欧美绝品在线观看成人午夜影视| 国产精品久久久久四虎| 久久草av在线| 在线免费亚洲电影| 香蕉加勒比综合久久| 99久久精品国产毛片| 中文字幕精品综合| 国产精品1024| 久久久精品综合| 美女视频黄 久久| 久久亚洲精品国产精品紫薇| 三级精品在线观看| 欧美剧情电影在线观看完整版免费励志电影| 中文字幕一区在线| 国产白丝精品91爽爽久久| 欧美精品一区二区久久久| 奇米精品一区二区三区在线观看| 91精品国产乱| 免费人成在线不卡| 欧美成人精品二区三区99精品| 日韩专区欧美专区|