High-speed telemetry drill pipe network optimizes drilling dynamics

A 57,000-bps transmission rate enhances real-time monitoring.

This article discusses the successes and lessons learned during the first deployment of IntelliServ’s High-Speed Telemetry Drill Pipe Network with Inteq’s Rotary Closed Loop System (RCLS) AutoTrak and Triple Combo suite in North America. The article details the operational experience while drilling two lateral wells with an emphasis on drilling optimization and LWD processing with the ability to receive real-time, memory-quality data via a telemetry drill pipe network.

In addition to the improvements in LWD technologies, there has been a remarkable development of downhole drilling dynamics and optimization tools. A telemetry drill pipe network that delivers real-time, memory-quality data at 57,000-bps transmission rates provides a step change in capability for the industry-dramatically changing the decisions that can be made in real time.

The major lessons learned while drilling the lateral wells were: 1) real-time monitoring is a valuable tool for controlling and mitigating dynamic dysfunctions downhole, resulting in immediate ROP improvements; 2) high-resolution borehole images via telemetry drill pipe facilitate real-time on-site dip picking and analysis of downhole conditions; 3) high-resolution real-time images facilitate decisions regarding casing setting depth and/or elimination of an entire casing string (as seen in the second lateral well); 4) high volume of real-time memory data imposes new challenges on surface software systems; and 5) handling of telemetry drill pipe at surface plays a key role in improving the efficiency of overall drilling operations. 

With a high-speed telemetry drill pipe network, drilling engineers can have high-quality downhole dynamics information and Mechanical Specific Energy (MSE) data in real time while drilling. Likewise, the geologists and petrophysicists can have access to 8-sector gamma images and 16-sector density images, both in real time via high-speed telemetry drill pipe. The operational success of telemetry drill pipe at Wamsutter also makes a strong case for deploying this technology in the deepwater GOM.

INTRODUCTION

The telemetry drill pipe network was commercially introduced in early 2006. The design concept of telemetry drill pipe is based on electromagnetic induction, where an alternating current or voltage in one coil induces varying magnetic field in the ferrite core, which in turn induces alternating current in the second coil placed in proximity. The ferrite core and inductive coil are located on the box and pin end of second-generation double-shouldered connections.

The data cable, which is encapsulated within a pressure-sealed conduit, travels inside the body of the tool joints and enters into the internal diameter of the telemetry drill pipe at the internal upset. A detailed description of telemetry drill pipe design can be found in the literature.

Telemetry drill pipe networks have successfully transmitted data at a rate of 57,000 b/s in several field trials. The data rates demonstrated by this technology are significantly higher than the standard mud-pulse telemetry (8 to 12 b/s).

Electromagnetic telemetry can deliver rates up to 100 b/s, but still is nowhere close to the bandwidth available with high-speed telemetry drill pipe network.

The first deployment in North America of IntelliServ’s high-speed telemetry drill pipe network was in conjunction with Inteq’s RCLS and a triple combo logging suite. Previous deployments of this technology with RCLS/LWD/triple combo include Troll Field, in the North Sea, where two extended lateral wells were drilled, and offshore Myanmar, where a commercial well was drilled for pressure management.

The two subject lateral wells were drilled in the Wamsutter Field, Sweetwater County, Wyoming. High-speed telemetry drill pipe was deployed with an RCLS and MWD/LWD tools that measured gamma ray, resistivity, high resolution resistivity, pressure, density, neutron, acoustic and downhole drilling dynamics. The memory-quality data that was being transmitted to surface while drilling with this technology was previously only available once the MWD/LWD tools were on surface for downloading the memory data.

Some of the real-time data transmission capability that differentiated this technology from all the other telemetry systems included 16-sector density images, 8-sector gamma images, high-resolution resistivity images, a full suite of downhole drilling dynamics data (including bending moments, downhole WOB and torque on bit), and calculated downhole MSE data. Figures 1 and 2 show real-time images from Wells 1 and 2, respectively. 

Fig. 1 . Real-time log with 8-sector gamma image, LWD and downhole drilling dynamics data as shown on proprietary web-based display software for Well 1.

Fig. 2 . Real-time, high-resolution resistivity images from Inteq’s StarTrak tool from Well 2.

PROJECT BACKGROUND AND OPERATOR’S EXPECTATIONS

Wamsutter Field, encompassing about 1,700 sq mi, is located in southwest Wyoming and is one of the largest tight-gas resources in North America. The field was discovered in late 1950s, and the primary productive interval in the field is the Almond Formation, the youngest formation in the Mesaverde Group.

Trial objectives.

The main objectives of the field trials were: 
To minimize HSE incidents 
To learn how to handle telemetry drill pipe
To assess reliability of the telemetry drill pipe network
To establish accurate directional control and geo-steering 
To optimize ROP performance and BHA dynamics control (the operator experience demonstrated that vibration and stick-slip events were an issue due to the hard formations)
To test the feasibility of deploying high-speed telemetry drill pipe network with RCLS and a full suite of MWD/LWD tools.

ASSESSING POTENTIAL FOR THE NEW TECHNOLOGY

High-speed telemerty drill pipe’s advantages arise out of the following cost-saving benefits.

Improving drilling efficiency and time savings. Trips from MWD failures can be avoided with telemetry drill pipe/mud pulse telemetry redundancy. Additional time can be saved by sending up survey data and downlinking to RCLS and MWD/LWD tools. Furthermore, tool reliability can be improved by continuous downhole monitoring of shock, vibration and bending moments. Additional trips can be avoided by diagnosing and fixing them via the network.

High-speed telemetry drill pipe networks also provide real-time, high-resolution downhole drilling dynamics for maximizing drilling efficiency (downhole MSE) and minimizing vibration modes (stick-slip, bending moments, downhole torque, etc.). Real-time, high-resolution density and resistivity images are available for casing-setting depth and/or total elimination of an entire casing string.

Improving wellbore delivery. High-speed telemetry drill pipe networks also provide real-time memory-quality wellbore images for geo-steering and wellbore placement. Real-time wellbore stability and wellbore pressure management can also be improved with real-time memory-quality wellbore images, caliper data and annular pressure measurement while drilling and reaming. Also, hole quality can be enhanced through continuous two-way communication with RCLS and MWD/LWD tools.

DRILLING OPERATIONS

Both subject wells were horizontal wells drilled to evaluate and set production liners in the Almond Formation. The following is a brief summary of the drilling operation for both wells.

Well 1. The directional program in the 8?-in. hole specified that the hole angle to be built at 4.0°/100 ft, from 82° to 96°, and then drop back to 92°. The 8?-in. BHA included RCLS with MWD/LWD tools increasing gamma ray, resistivity, pressure (OnTrak), density and neutron (LithoTrak), acoustic (SoundTrak) and downhole drilling dynamics (CoPilot).

The well was successfully drilled to TD with a few challenges that were overcome by proper bit selection and by real-time monitoring of downhole drilling dynamics and wellbore images. One of the key measures of success realized during this operation was seamless switching from wired-pipe telemetry to mud pulse telemetry when the upper communication bus was lost in the MWD/LWD tool. In many instances, drilling dynamics malfunctions were mitigated by real-time monitoring of memory-quality downhole drilling dynamics data, Fig. 3. As shown by the star in Fig. 3, the wired-pipe, real-time log catches the whirl event in detail while the mud-pulse log shows only a point. The high-density data of the whirl event helped the directional driller to reduce RPMs and avoid downhole whirl. 

Fig. 3 . Comparing the drilling dynamics data logs from wired-pipe telemetry and mud pulse telemetry.

Well 2. For this well, the directional program specified for the hole angle to be built from vertical to 92°. The well was drilled in 12?-in. and 8?-in. hole sections with high-speed telemetry drill pipe network deployed in the 8?-in. section. The 8?-in. BHAs included the RCLS, in conjunction with MWD/LWD tools including gamma ray, resistivity, pressure, density and neutron, high-resolution resistivity imaging tool and downhole drilling dynamics.

More challenges were encountered in Well 2 regarding drilling dynamics mitigation (especially stick-slip) as compared with Well 1. These challenges were again overcome by changing bit-selection criteria and BHA design. One of the major objectives to eliminate the intermediate casing string was achieved when the 8?-in. hole was drilled all the way to TD, eliminating a 7-in. liner. Figure 4 shows images from the horizontal section of Well 2. The images were taken while reaming down. The wired-pipe images helped BP to leave the hole open; subsequently, the hole stabilized itself. The images also helped BP to drill the horizontal section all the way to TD, skipping the 7-in. liner. These images were taken at a trip rate of about 320 ft/hr. Also, a comparison is shown with the mud-pulse image.  

 Fig. 4 . Real-time density images that helped BP to eliminate an intermediate 7-in. liner, with direct saving of time and money and reduction in well complexity.

RESULTS AND LESSONS LEARNED

The operator’s major objectives were met with the delivery of a smooth wellbore to TD while staying within the Upper Almond Sand, without any HSE incidents. Figure 5 shows a 3D rendition of the lateral (from Well 1) in the Upper Almond Sand. The high-speed telemetry drill pipe network successfully provided: Real-time, memory-quality drilling dynamics and formation evaluation data, downhole MSE and high-resolution resistivity and density images.  

 Fig. 5 . A 3D rendition of the well path drilled for Well 1.

The major lessons learned during the deployment of high-speed telemetry drill pipe at Wamsutter Field revolved around issues described below.

Proactive drilling performance and vibration management. Downhole data was obtained from the service company’s drilling dynamics tool, measuring parameters such as downhole WOB, downhole torque and bending moments that can vary significantly during drilling operations. MSE was also calculated from the downhole measurements provided by the tool. These parameters were monitored in real time to manage vibration and optimize drilling performance throughout the section. The high-density drilling dynamics data from telemetry drill pipe was displayed every 10 s in Well 1 and 5 s in Well 2, allowing rapid response that lead to drilling optimization. Mud-pulse telemetry often transmits real-time drilling dynamics data with updates ranging from 60 to 180 s, which dilutes drilling dynamics information, preventing a proper diagnosis of downhole conditions.

Figure 6 illustrates the real-time memory-quality downhole dynamics data transmitted via high-speed telemetry drill pipe that facilitated the instant response required to mitigate downhole stick-slip by increasing RPM.

Fig. 6 . Real-time memory log via telemetry drill pipe; RPMs were slowly increased to control stick-slip.

Improving drilling efficiency and time savings. Benefits included time saved by sending up survey data and downlinking to RCLS tools, by transmitting the information directly via telemetry drill pipe network. Time was also saved by avoiding trips by having telemetry drill pipe/mud pulse telemetry redundancy.
The improved two-way communication allows performing a comprehensive set of tool diagnostics that were previously only available once the tools are on surface, after a BHA trip. Improved tool reliability was also possible by the continuous monitoring of downhole stick-slip, vibration and bending moments.
 
Improved wellbore delivery. Memory-quality wellbore images were transmitted, allowing for geo-steering and optimized wellbore placement. These memory-quality wellbore images, together with caliper data and annular-pressure measurement while drilling and reaming, enabled real-time wellbore stability and wellbore pressure management. With real-time memory images, the client is able to perform bed dip analysis, update its structural and seismic mapping and identify larger structural events such as faults and bedding, and understand lost circulation mechanism and borehole washouts while drilling. Figures 7 and 8 illustrate real-time, memory-quality, high-resolution resistivity images.  



Fig. 7 . Faulting and stress-induced fracturing as shown in the resistivity image for Well 2.

Fig. 8 . Sediment deformation and cross bedding as shown in the resistivity image for Well 2.

Surface software challenges. Several improvements on the surface data-acquisition and processing system have been made since the first prototype deployment of multi-combo LWD systems with telemetry drill pipe network with a goal toward robust high-speed, real-time data handling at surface.

Data swivel and cable issues. A data swivel top drive was used in place of a saver sub and was identified as having high potential for being damaged if the driller did not have adequate control over stabbing when making up pipe, Fig. 9.

Fig. 9 . Top drive swivel sub showing the stator and data cable that connects the stator to the surface data acquisition server.

The alignment of the top drive was identified as being critical to prevent damage to the data swivel. Good visibility with the rig camera was critical for controlled top-drive makeup to the drill pipe (angle and focus). Increasing the sensitivity of driller’s joy stick, and making sure the top-drive grabber box was as deep as possible on the drill pipe box, was helpful in preventing mis-stabs. Securing the data cable correctly was identified as a way to prevent cable damage. In the future, development of a wireless data swivel will eliminate this problem.

Handling of telemetry drill pipe and BHA considerations. It is important to demonstrate to the drilling crew any non-standard BHA components, such as a circulating sub, well in advance of beginning operations with telemetry drill pipe. This will allow for proper wiring and testing of drillstring components.

CONCLUSIONS

The first deployment of high-speed telemetry drill pipe with RCLS/MWD/LWD in North America successfully demonstrated the ability to transmit high-bandwidth data in real time. The telemetry drill pipe network uptime (reliability) was 85% for Well 1 and 93% for Well 2. The successes during its deployment have further proven the compatibility of telemetry drill pipe network with the latest drilling and MWD/LWD technologies. This technology has improved the way drilling engineers, geologists and petrophysicists interpret and manage real-time data while drilling.

Real-time, memory-quality drilling dynamics data helps mitigate downhole problems instantaneously, which, in turn, leads to higher drilling efficiency and wellbore stability. Real-time, high-resolution gamma/density images and formation evaluation data facilitate reservoir assessment in. The real challenge in using the full potential of this technology lies in managing the high volume of downhole information available in real time. The success of wired-pipe telemetry, along with 400,000 ft and 40 wells drilled globally, means the new technology is ready for deepwater GOM.

關鍵字: 鉆井 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 www.1314163.com Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
国产精品婷婷午夜在线观看 _国产精品亚洲自拍_天天综合日日夜夜精品 _蜜桃免费网站一区二区三区_都市激情国产精品_亚洲国产精品一区二区第四页av _heyzo一区
日韩三级伦理片妻子的秘密按摩| 国产盗摄一区二区三区| 91精品国产综合久久婷婷香蕉| 国产精品 日产精品 欧美精品| 国产一区二区福利视频| 韩国女主播一区| 国产精品1区2区3区在线观看| 国产在线一区二区| 国产麻豆精品theporn| 一本大道久久a久久精品综合| 欧美三级欧美一级| 中文字幕在线不卡视频| 亚洲精品中文在线| 免费成人在线播放| 国产xxx精品视频大全| 国产91露脸合集magnet| 欧美性大战久久久久久久| 欧美日韩精品一区二区| 精品久久久久av影院| 国产日韩欧美高清| 国产精品盗摄一区二区三区| 一区二区三区中文免费| 免费在线视频一区| 成人av电影在线| 欧美日韩日日骚| 91精品福利在线一区二区三区| 久久久亚洲精品石原莉奈| 亚洲欧美另类小说视频| 天堂av在线一区| 狠狠色丁香久久婷婷综合_中 | 精品亚洲成a人| av中文字幕在线不卡| 欧美日韩久久久久久| 国产精品人成在线观看免费| 亚洲一级在线观看| 成人黄色777网| 精品国产免费视频| 午夜视频在线观看一区二区| 91香蕉视频在线| 一区二区三区91| 风流少妇一区二区| 欧美白人最猛性xxxxx69交| 亚洲自拍都市欧美小说| 成人性视频网站| 日韩免费观看高清完整版在线观看 | 精品人在线二区三区| 亚洲精品乱码久久久久久久久| 久久99久久久久| 欧美日韩亚洲综合在线 | 色哦色哦哦色天天综合| 日本一区二区三区在线观看| 免费在线观看日韩欧美| 欧美日韩国产另类一区| 亚洲狼人国产精品| 成人国产精品免费观看视频| 日韩欧美中文一区二区| 日韩精品久久理论片| 精品视频123区在线观看| 一区二区国产视频| 色素色在线综合| 日韩伦理免费电影| 91丨九色porny丨蝌蚪| 日韩一区中文字幕| 成人黄色在线视频| 日韩中文字幕一区二区三区| 色综合天天综合网天天看片| 国产精品国产三级国产专播品爱网| 国产伦精品一区二区三区视频青涩| 精品国产伦一区二区三区免费| 美国三级日本三级久久99| 欧美日韩国产欧美日美国产精品| 丝袜脚交一区二区| 日韩亚洲欧美一区二区三区| 蜜桃一区二区三区四区| 日韩一级大片在线观看| 捆绑紧缚一区二区三区视频| 欧美电影免费提供在线观看| 国产综合色视频| 日本一区二区三区免费乱视频| 国产超碰在线一区| 国产精品久久久久久久久晋中| caoporn国产精品| 亚洲欧美激情小说另类| 色老头久久综合| 天堂午夜影视日韩欧美一区二区| 91精品综合久久久久久| 国产剧情av麻豆香蕉精品| 中日韩av电影| 欧美私模裸体表演在线观看| 日日摸夜夜添夜夜添精品视频| 日韩一级片网站| 成人自拍视频在线观看| 一区二区三区日本| 欧美一区二区人人喊爽| 高清不卡一区二区在线| 亚洲制服丝袜av| 精品国产乱码久久久久久图片 | 国产在线播精品第三| 久久久久久免费| 色天使色偷偷av一区二区| 久久99国内精品| 国产精品国产三级国产a| 欧美日韩在线亚洲一区蜜芽| 国产一区二区三区四| 亚洲激情自拍视频| 欧美成人a视频| 色哟哟精品一区| 久久精品久久99精品久久| 亚洲欧洲日韩一区二区三区| 91麻豆精品国产91久久久久久久久| 国产成人在线色| 亚洲第一二三四区| 国产精品美日韩| 欧美一区二区在线免费观看| 99久久精品免费看国产| 裸体健美xxxx欧美裸体表演| 欧美极品aⅴ影院| 日韩一级视频免费观看在线| 99国产精品一区| 国模大尺度一区二区三区| 一区二区三区中文字幕精品精品| 欧美变态tickle挠乳网站| 一本色道久久综合亚洲91| 国产在线播放一区| 日韩av不卡在线观看| 亚洲色图清纯唯美| 久久婷婷国产综合国色天香| 欧美日韩三级一区| 国产精品欧美一级免费| 日韩视频一区二区三区| 在线观看91视频| 岛国一区二区三区| 久久99九九99精品| 天天综合日日夜夜精品| 亚洲免费伊人电影| 久久久久久久精| 日韩精品专区在线影院重磅| 欧美视频完全免费看| 成人美女视频在线观看| 久久国产精品免费| 免费成人在线网站| 亚洲一区二区三区视频在线播放| 久久久99久久| 在线播放视频一区| 91国偷自产一区二区开放时间| 经典三级在线一区| 免费三级欧美电影| 日av在线不卡| 午夜精品福利一区二区三区av | 亚洲精品五月天| 国产欧美日韩不卡| 国产亚洲综合av| 日韩精品中文字幕在线不卡尤物| 欧美日韩视频一区二区| 欧美日韩国产综合一区二区三区| 在线观看91视频| 久久综合久久99| 一区二区免费在线播放| 亚洲一区二区不卡免费| 亚洲男同性视频| 亚洲自拍偷拍av| 三级欧美在线一区| 亚洲一区二区在线观看视频| 亚洲一区二区美女| 亚洲成av人片在线观看| 日本视频免费一区| 久久99国内精品| 国产美女视频一区| youjizz久久| 色播五月激情综合网| 欧美视频第二页| 欧美精品在线一区二区三区| 欧美一区二区三区四区视频| 日韩欧美黄色影院| 久久久久国产精品免费免费搜索 | 日韩高清一级片| 国产在线播放一区| 色综合久久久久久久| 欧美女孩性生活视频| 欧美久久久影院| 精品sm捆绑视频| 一区在线中文字幕| 日日夜夜免费精品| 风流少妇一区二区| 在线观看亚洲一区| 精品捆绑美女sm三区| 中文字幕一区二区三区色视频| 亚洲精品免费电影| 美女一区二区视频| 国产不卡视频一区| 91国产免费看| 精品国产污网站| 亚洲精品亚洲人成人网| 免费一级欧美片在线观看| 99久久精品99国产精品| 亚洲一区二区三区不卡国产欧美| 国产一区二区三区免费在线观看| 97久久久精品综合88久久| 99久久综合色| 日韩一级二级三级|